JUMPSEAT
AEROSPACE NEWS

US Army Orders 16 New UH-60M Black Hawks

Key Takeaways
  • US Army orders 16 new UH-60M Black Hawk helicopters.
  • Contract worth $234 million awarded to Sikorsky.
  • Production to take place in Stratford, Connecticut.
  • Delivery expected by June 30, 2028.
Sign in to view key takeaways Get full access to in-depth analysis and key takeaways.
Sign In
Silver membership required Upgrade to Silver to access Key Takeaways.
Upgrade
Strategic Implications

This order may indicate the US Army's ongoing commitment to modernizing its helicopter fleet, which could suggest a continued demand for advanced utility helicopters. The selection of Sikorsky's UH-60M model may also signal the Army's preference for proven and reliable aircraft, which could impact future procurement decisions.

Sign in to view strategic implications Get full access to strategic analysis and expert insights.
Sign In
Silver membership required Upgrade to Silver to access Strategic Implications.
Upgrade

What Happened

Sikorsky Wins $234 Million Contract For Helicopter Production

The US Army has awarded Sikorsky a $234 million contract to produce 16 new UH-60M Black Hawk helicopters, with production set to take place in Stratford, Connecticut. The contract modification brings the cumulative value of the procurement action to $356 million, with delivery expected by June 30, 2028. The UH-60M is the Army’s primary tactical utility transport helicopter, used for air assaults, medical evacuations, and general support during combat and stability operations. This order is part of the Army’s ongoing effort to modernize its fleet and replace older models, as reported by Unknown Source.

Source | Originally Published: September 17, 2026

Advertisement 728 × 90
JUMPSEAT
AEROSPACE NEWS
JUMPSEAT
AEROSPACE NEWS

US Army Orders 16 New UH-60M Black Hawks

Sponsored by: Jumpseat Solutions
Key Takeaways
  • US Army orders 16 new UH-60M Black Hawk helicopters.
  • Contract worth $234 million awarded to Sikorsky.
  • Production to take place in Stratford, Connecticut.
  • Delivery expected by June 30, 2028.
Sign in to view key takeaways Get full access to in-depth analysis and key takeaways.
Sign In
Silver membership required Upgrade to Silver to access Key Takeaways.
Upgrade
Strategic Implications

This order may indicate the US Army's ongoing commitment to modernizing its helicopter fleet, which could suggest a continued demand for advanced utility helicopters. The selection of Sikorsky's UH-60M model may also signal the Army's preference for proven and reliable aircraft, which could impact future procurement decisions.

Sign in to view strategic implications Get full access to strategic analysis and expert insights.
Sign In
Silver membership required Upgrade to Silver to access Strategic Implications.
Upgrade

What Happened

Sikorsky Wins $234 Million Contract For Helicopter Production

The US Army has awarded Sikorsky a $234 million contract to produce 16 new UH-60M Black Hawk helicopters, with production set to take place in Stratford, Connecticut. The contract modification brings the cumulative value of the procurement action to $356 million, with delivery expected by June 30, 2028. The UH-60M is the Army’s primary tactical utility transport helicopter, used for air assaults, medical evacuations, and general support during combat and stability operations. This order is part of the Army’s ongoing effort to modernize its fleet and replace older models, as reported by Unknown Source.

Source | Originally Published: September 17, 2026

Advertisement 300 × 250 Google AdSense