JUMPSEAT
AEROSPACE NEWS

Ohio Steelmaker Lands $995M Deal for Artillery Shell Steel

Key Takeaways
  • Metallus awarded $995M contract for High Fragmentation 1 steel.
  • Contract runs through Sept. 24, 2031, with no option periods.
  • Steel used for 155 mm artillery shells, including M795 high-explosive rounds.
  • Funding comes from fiscal 2025 through 2029 accounts.
Sign in to view key takeaways Get full access to in-depth analysis and key takeaways.
Sign In
Silver membership required Upgrade to Silver to access Key Takeaways.
Upgrade
Strategic Implications

This contract may indicate the US military's efforts to bolster its defense industrial base, particularly in the production of critical materials like High Fragmentation 1 steel. The deal could suggest a shift towards prioritizing domestic production and reducing reliance on foreign suppliers, which may have implications for the global steel market and the US military's supply chain.

Sign in to view strategic implications Get full access to strategic analysis and expert insights.
Sign In
Silver membership required Upgrade to Silver to access Strategic Implications.
Upgrade

What Happened

Metallus Secures Major Contract for High Fragmentation Steel Production

The Defense Logistics Agency has awarded Ohio-based steelmaker Metallus a contract worth up to $995 million for the production of High Fragmentation 1 steel, a special alloy used in the manufacture of 155 mm artillery shells. The five-year contract, which runs through September 2031, will provide steel for the US Army, Marine Corps, Navy, Air Force, and Space Force. Metallus has been producing HF-1 steel for the US military since 1993 and has recently expanded its output as part of the Army’s push to increase artillery shell production. This development was first reported by an unknown source.

Source | Originally Published: September 26, 2026

Advertisement 728 × 90
JUMPSEAT
AEROSPACE NEWS
JUMPSEAT
AEROSPACE NEWS

Ohio Steelmaker Lands $995M Deal for Artillery Shell Steel

Sponsored by: Jumpseat Solutions
Key Takeaways
  • Metallus awarded $995M contract for High Fragmentation 1 steel.
  • Contract runs through Sept. 24, 2031, with no option periods.
  • Steel used for 155 mm artillery shells, including M795 high-explosive rounds.
  • Funding comes from fiscal 2025 through 2029 accounts.
Sign in to view key takeaways Get full access to in-depth analysis and key takeaways.
Sign In
Silver membership required Upgrade to Silver to access Key Takeaways.
Upgrade
Strategic Implications

This contract may indicate the US military's efforts to bolster its defense industrial base, particularly in the production of critical materials like High Fragmentation 1 steel. The deal could suggest a shift towards prioritizing domestic production and reducing reliance on foreign suppliers, which may have implications for the global steel market and the US military's supply chain.

Sign in to view strategic implications Get full access to strategic analysis and expert insights.
Sign In
Silver membership required Upgrade to Silver to access Strategic Implications.
Upgrade

What Happened

Metallus Secures Major Contract for High Fragmentation Steel Production

The Defense Logistics Agency has awarded Ohio-based steelmaker Metallus a contract worth up to $995 million for the production of High Fragmentation 1 steel, a special alloy used in the manufacture of 155 mm artillery shells. The five-year contract, which runs through September 2031, will provide steel for the US Army, Marine Corps, Navy, Air Force, and Space Force. Metallus has been producing HF-1 steel for the US military since 1993 and has recently expanded its output as part of the Army’s push to increase artillery shell production. This development was first reported by an unknown source.

Source | Originally Published: September 26, 2026

Advertisement 300 × 250 Google AdSense