What Happened
Hanwha Ocean To Build KDDX Lead Ship For South Korean Navy
South Korea’s arms procurement agency has signed a contract with Hanwha Ocean for the detailed design and construction of the first KDDX next-generation destroyer, marking a significant step forward in the country’s efforts to develop its domestic defense capabilities. The lead ship is scheduled to be delivered to the South Korean Navy by the end of 2032, with the entire program expected to cost around $5.46 billion. The KDDX will feature a range of indigenous systems, including a combat management system and multifunction phased-array radar, and will be designed to reduce its radar signature. This development was first reported by UPI.com.