JUMPSEAT
AEROSPACE NEWS

Army Tests Next-Gen Comms Gear in Mojave Desert

Key Takeaways
  • Army tests NGC2 architecture in Mojave Desert.
  • Project Convergence Capstone 6 runs from July 20-29.
  • 4th Infantry Division participates with 9,700 soldiers.
  • Tests aim to refine NGC2 prototype for contract awards.
Sign in to view key takeaways Get full access to in-depth analysis and key takeaways.
Sign In
Silver membership required Upgrade to Silver to access Key Takeaways.
Upgrade
Strategic Implications

The Army's testing of NGC2 in extreme environments may indicate a focus on ruggedizing next-generation communications gear, which could influence procurement decisions and signal a shift towards more resilient and adaptable systems. This effort suggests the Army is prioritizing the development of a robust and reliable command and control architecture, which may have significant implications for future military operations.

Sign in to view strategic implications Get full access to strategic analysis and expert insights.
Sign In
Silver membership required Upgrade to Silver to access Strategic Implications.
Upgrade

What Happened

Project Convergence Pushes NGC2 Architecture To The Limit

The US Army is conducting a critical test of its Next Generation Command and Control (NGC2) architecture in the Mojave Desert as part of Project Convergence Capstone 6. The experiment, which runs from July 20-29, involves 9,700 soldiers from the 4th Infantry Division and aims to stress-test the NGC2 ecosystem in extreme heat and rugged terrain. The Army is seeking to refine its prototype and inform upcoming contract awards, with a focus on commercial-first approaches and software-defined networking capabilities. The test was first reported by Breaking Defense.

Source | Originally Published: July 19, 2026

Advertisement 728 × 90
JUMPSEAT
AEROSPACE NEWS
JUMPSEAT
AEROSPACE NEWS

Army Tests Next-Gen Comms Gear in Mojave Desert

Sponsored by: Jumpseat Solutions
Key Takeaways
  • Army tests NGC2 architecture in Mojave Desert.
  • Project Convergence Capstone 6 runs from July 20-29.
  • 4th Infantry Division participates with 9,700 soldiers.
  • Tests aim to refine NGC2 prototype for contract awards.
Sign in to view key takeaways Get full access to in-depth analysis and key takeaways.
Sign In
Silver membership required Upgrade to Silver to access Key Takeaways.
Upgrade
Strategic Implications

The Army's testing of NGC2 in extreme environments may indicate a focus on ruggedizing next-generation communications gear, which could influence procurement decisions and signal a shift towards more resilient and adaptable systems. This effort suggests the Army is prioritizing the development of a robust and reliable command and control architecture, which may have significant implications for future military operations.

Sign in to view strategic implications Get full access to strategic analysis and expert insights.
Sign In
Silver membership required Upgrade to Silver to access Strategic Implications.
Upgrade

What Happened

Project Convergence Pushes NGC2 Architecture To The Limit

The US Army is conducting a critical test of its Next Generation Command and Control (NGC2) architecture in the Mojave Desert as part of Project Convergence Capstone 6. The experiment, which runs from July 20-29, involves 9,700 soldiers from the 4th Infantry Division and aims to stress-test the NGC2 ecosystem in extreme heat and rugged terrain. The Army is seeking to refine its prototype and inform upcoming contract awards, with a focus on commercial-first approaches and software-defined networking capabilities. The test was first reported by Breaking Defense.

Source | Originally Published: July 19, 2026

Advertisement 300 × 250 Google AdSense