JUMPSEAT
AEROSPACE NEWS
AI-powered aerospace news and executive briefings
Home Categories DEFENSE & SECURITY

GKN Aerospace Delivers First Upgraded RM12 Engine

Enhanced Performance Program Boosts Gripen C/D Fleet Capabilities

GKN Aerospace has delivered the first upgraded RM12 engine to the Swedish Armed Forces as part of the RM12EP program, aimed at improving the performance and long-term supportability of Sweden’s Gripen C/D fleet. The SEK 400 million effort involves GKN, Saab, and GE Aerospace, with targets including increased thrust, improved endurance, and lower lifecycle costs. The project is underway, with testing being conducted at GKN Aerospace’s Trollhättan site in Sweden. This development was first reported by AeroTime.

Key Takeaways
    Sign in to view key takeaways Get full access to in-depth analysis and key takeaways.
    Sign In
    Silver membership required Upgrade to Silver to access Key Takeaways.
    Upgrade
    Strategic Implications

    Sign in to view strategic implications Get full access to strategic analysis and expert insights.
    Sign In
    Silver membership required Upgrade to Silver to access Strategic Implications.
    Upgrade
    Advertisement 728 × 90
    Source: AeroTime (RSS) JAN Tracker: SRCE-2026-1774342860271-3426
    URL: https://www.aerotime.aero/articles/gkn-first-upgraded-rm12-engine-gripen
    JUMPSEAT
    AEROSPACE NEWS
    JUMPSEAT
    AEROSPACE NEWS
    My Account
    Sign Out
    Home Categories DEFENSE & SECURITY

    GKN Aerospace Delivers First Upgraded RM12 Engine

    Enhanced Performance Program Boosts Gripen C/D Fleet Capabilities

    GKN Aerospace has delivered the first upgraded RM12 engine to the Swedish Armed Forces as part of the RM12EP program, aimed at improving the performance and long-term supportability of Sweden’s Gripen C/D fleet. The SEK 400 million effort involves GKN, Saab, and GE Aerospace, with targets including increased thrust, improved endurance, and lower lifecycle costs. The project is underway, with testing being conducted at GKN Aerospace’s Trollhättan site in Sweden. This development was first reported by AeroTime.

    Key Takeaways
      Sign in to view key takeaways Get full access to in-depth analysis and key takeaways.
      Sign In
      Silver membership required Upgrade to Silver to access Key Takeaways.
      Upgrade
      Strategic Implications

      Sign in to view strategic implications Get full access to strategic analysis and expert insights.
      Sign In
      Silver membership required Upgrade to Silver to access Strategic Implications.
      Upgrade
      Source: AeroTime (RSS) JAN Tracker: SRCE-2026-1774342860271-3426
      URL: https://www.aerotime.aero/articles/gkn-first-upgraded-rm12-engine-gripen
      Advertisement 300 × 250 Google AdSense