Changi Airport’s Underground Link to Reach Terminal 2 in Four Minutes
Changi Airport Group has unveiled an underground people-mover system connecting Terminal 5 and Terminal 2 within four minutes, according to AeroTime on December 30 2025. The automated system will operate similarly to the existing Skytrain, with trains running every four to eight minutes.